#HiDefNES update

All kits up to order #2100 have been shipped out!

We seem to be having a lot of problems with the sockets supplied, they don’t seem to grip the cpu and ppu legs as well as sockets used in the past. Still looking for a solution other than bend each row of legs out and force it back in to the sockets…